Line 10: | Line 10: | ||
**Supplies 10% | **Supplies 10% | ||
*Make extension cord with switch for brewing pump | *Make extension cord with switch for brewing pump | ||
− | ** | + | **1 hour job, once supplies are purchased |
**Need extension cord, outlet with switch and outlet box. Wanted to have 2 switches, but modifiy later when/if I get a second pump | **Need extension cord, outlet with switch and outlet box. Wanted to have 2 switches, but modifiy later when/if I get a second pump | ||
*Add heating mat to fermentor/kegerator | *Add heating mat to fermentor/kegerator |
Revision as of 11:00, 28 January 2015
Contents |
Planned Projects
- Build buffet table for home
- Design 95%
- Building Material Procurement 4%
- Modify CPU fan for Stir Plate
- Fan modified, need enclosure, magnet and stir bar
- Rehab fixie bike
- Design 10%
- Supplies 10%
- Make extension cord with switch for brewing pump
- 1 hour job, once supplies are purchased
- Need extension cord, outlet with switch and outlet box. Wanted to have 2 switches, but modifiy later when/if I get a second pump
- Add heating mat to fermentor/kegerator
- Will need help with Electrical work
- modify BrewPi as needed.
- Microwave Spot Welder
Collaboration Projects
- Heath - Laser Cutter from CD-RW Drive
- Dan - Enclosure for CNC
Possible classes
- AutoCAD
- Inventor
- Homebrewing
Completed Projects
- Frementation Chamber/Kegerator Build
- Shoe Cubby Bench
- Laser'd Tote for Brewing Supplies
- Built workbenches for space